LDG provided preliminary and final design as well as survey, environmental, permitting, bidding, and construction administration services for the Clute Park Road reconstruction design in the Village or Watkins Glen, Schuyler County, New York. The portion of the road that was reconstructed extends from the park entrance at East 4th Street south to the new treatment plant access road. The original pavement condition of the heavily used 900-feet long and 30-feet wide roadway was poor to failing and required more than a simple resurfacing. The poor surface drainage in the area caused multiple areas of ponding and accelerated the pavement failure. A critical component to the reconstruction design was a new stormwater conveyance system, which discharged directly into the canal. The new stormwater conveyance system included 978 feet 12-inch PVC pipe, eight catch basins, and a manhole.