Troy Borough initiated repairs after two large holes were identified in the slab creating a safety hazard for the traveling public. The project included the reconstruction of existing deteriorated wingwalls and drainage improvements to limit the flow of water across the structure to help preserve the service life of the bridge. A membrane waterproofing and new bituminous pavement across the structure were added to prevent infiltration into the deck. LDG provided professional engineering services from design through construction inspection.
LDG utilized its web-based bid plans site to advertise and bid the project and provided as needed construction observation and administration during the rehabilitation project./