Cleveland, OH

GCRTA CNG Facility

Larson Design Group (LDG) provided project management as well as structural, architectural, mechanical, and electrical engineering services for the final design of a replacement CNG compression station for the Greater Cleveland Regional Transit Authority (GCRTA), in Cleveland, Ohio. In addition to the engineering design, the project involved permitting and documenting existing conditions; coordinating with GCRTA for electrical, natural gas, and telecommunication services; conducting site visits and coordinating with stakeholders; preparing the building permit submission; and preparing final drawings and specifications reflecting all of the changes and comments by the reviewing authorities. The fast-fill station was designed to fill over 100 transit buses and is located at GCRTA’s Hayden bus garage in East Cleveland.

Ready to discuss your project?