LDG performed a topographic land survey and prepared a final existing conditions plan prior to the design of the solar panel site area. This survey included establishing the property lines, rights-of-way side lines, and easement lines.
Once the design was finalized, LDG, working closely with Eaton’s Project Engineer staked the equipment reference lines in the field using a Trimble Robotic Instrument. Equipment associated with the operation of the solar panels was also staked.