This pipeline project consisted of survey stakeout for a 7-mile pipeline through treacherous terrain. As-built survey was also completed once the pipe was welded and lowered into the trench.
Working as a subconsultant, Larson Design Group attended meetings and worked as an intermediary between the client and the contractor to ensure the project was completed to specification. LDG’s proximity to the project was an asset to the project team.