Larson Design Group (LDG) provided landscape architecture, civil, building, and transportation engineering for the design-build delivery of a new $19M single-story 25,000-square-foot The Basic School (TBS) Fire Station facility. The facility includes a crew residential area, offices, apparatus bays, and support spaces such as lockers, laundry, a fitness room, dispatch, training room, testing, and conference rooms. The site includes staff, visitor and emergency vehicle parking, force protection measures, landscaping and the associated site improvements to support the fire station. The project includes the demolition of the existing fire station and intersection improvements to MCB1 and MCB2 including a new traffic circle and utility relocations. The project is scheduled for completion in December 2022.