Eaton Solar Panels Survey Project – Beaver Plant

Daniel C. Baker Assoc., Inc. (DCB, Inc.) performed a topographic land survey and prepared a final existing conditions plan prior to the design of the solar panel site area. This survey included establishing the property lines, rights-of-way side lines, and easement lines.

Once the design was finalized, DCB, Inc., working closely with Eaton’s Project Engineer, Toni Fidanzato, staked the equipment reference lines in the field using a Trimble Robotic Instrument. Equipment associated with the operation of the solar panels was also staked.